Prepare · By SistemaHub · 2026-11-25
From Workaround to Requirement: A Three-Column Observation Log
People rarely describe their workarounds when asked what they want. They describe the tool they wish they had, or the feature they saw elsewhere. The more reliable input is what they already do: the extra column, the copied message, the second check before closing a record. This article gives you a three-column observation log to capture that behaviour, a screening rule that separates a genuine unmet need from a training or configuration gap, and a hypothetical late-completion workaround traced to one testable requirement.
Why the workaround is better evidence than the request
A workaround is a small piece of design the team already made. Someone decided that copying a completion message into a second column was worth the effort, which means the underlying need was strong enough to absorb the cost. That decision is worth recording before it is replaced.
Microsoft's requirements guidance warns that projects starting from lists of isolated functional features can run into missing process steps discovered too late, misinterpretation by people who are not experts in the process, lower business engagement, and longer review cycles. [1]
The same guidance recommends business process mapping as the way to define requirements, drawing the as-is process and the to-be process before deriving detail. [1]
The three-column observation log
Use one row per observation, with three columns: observed behaviour, underlying need, candidate requirement. Keep each cell to a sentence.
Observed behaviour states what someone actually does, in plain terms: copies a reference number into a message, keeps a personal list of open items, rechecks a status before calling a customer. Underlying need states what that behaviour is trying to achieve, phrased without naming a feature. Candidate requirement states what the system would have to do for the behaviour to become unnecessary, and it stays provisional until the screening step.
Add two supporting fields if the log will be reviewed by more than one person: who was observed, and the date. Neither field is a requirement; both help when someone later asks where a row came from.
Microsoft's guidance recommends linking requirements to the lowest level of the business process hierarchy so they can be reported and managed at the same level, and it treats the requirement list as something to revise and refine iteratively rather than fix in one pass. [1]
A screening rule that keeps the log honest
Before a candidate requirement reaches a build conversation, run it through three questions in order. Can the behaviour be removed by training someone on a capability that already exists? Can it be removed by configuration, such as a field, a view, a notification or a permission change? If neither applies, is the remaining gap specific enough to describe as one testable requirement?
Microsoft's customization guidance notes that if some scenarios can be addressed with user training, teams can save substantial development and testing effort, and it recommends configuration over custom code wherever possible. [3]
The same guidance cautions against replicating a legacy system or lifting and shifting existing application experiences, because that pattern leads to excessive customization and limits access to future improvements in the standard service. [3]
Apply the rule consistently. A gap that a small script or an existing configuration option can close should be recorded as such, not escalated to custom development because the observation felt significant.
Worked example: a late-completion workaround
Hypothetical example, not a SistemaHub client story and not a benchmark. A coordinator closes the day's job list at a fixed time. A technician sometimes finishes after that point and sends a message the next morning. The coordinator keeps a personal note of jobs believed finished but not yet confirmed, and rechecks them before the shift starts.
Observed behaviour: the coordinator maintains a personal list of unconfirmed completions and rechecks it each morning. Underlying need: the coordinator needs to know which jobs are finished but not yet recorded, before deciding what to reassign. Candidate requirement: the system shows a list of jobs with no completion update, visible to the coordinator at the start of the day.
Screening: training does not remove the gap, because the coordinator already knows the process and the missing information is not in the system. A configuration option may close it if the existing tool can surface records by status and date without custom work; that is worth checking first. If no available view produces the list, the candidate requirement survives as one testable statement.
Write the test as a process check rather than a field check. Microsoft's guidance holds that test cases should cover the business process, not only individual requirements, so that the whole process is confirmed to work rather than one requirement being met in isolation. [1]
Keep the candidate requirement narrow
A requirement that survives screening should describe one observable outcome, not a screen. The example above does not ask for a dashboard, a notification system or a new status field. It asks for a list, shown to a named role, at a named point in the day, containing jobs with no completion update.
Microsoft's guidance recommends documenting requirements with fields that include a clear title, a description, acceptance criteria, a disposition of fit or gap, and a note of any temporary workaround in place before the requirement is fully implemented. [1]
That workaround field is the one teams skip. Filling it with the observed behaviour from your log keeps the reason for the requirement attached to it, and gives the reviewer something concrete to test against.
Microsoft's guidance also separates functional requirements, which define what the system should do, from non-functional requirements covering attributes such as performance, security and usability, and recommends gathering both. [1]
Review the log before it becomes a backlog
Circulate the log to one person from each role involved in the process. Ask them to mark any row where the observed behaviour is wrong, the underlying need is misstated, or the candidate requirement would not remove the behaviour. A row that survives that review is ready to enter the requirement list.
Microsoft's guidance recommends engaging stakeholders across departments to capture diverse perspectives and prioritise needs, using workshops, interviews and documentation reviews to clarify requirements and validate them against business objectives. [1]
Keep the log after the requirement is built. When someone later asks why a list exists, the row shows the behaviour it replaced and the date it was observed.
A useful next step
Log the workaround in three columns, screen it against training and configuration before writing anything testable, and keep the observed behaviour attached to the requirement that survives.
Discuss your observation log and candidate requirements with SistemaHub.Sources & further reading
- Define your requirements for your Dynamics 365 solution - Dynamics 365 | Microsoft Learn
- Custom work item type for business process-related tasks - Dynamics 365 | Microsoft Learn
- Customize and extend Dynamics 365 online - Dynamics 365 | Microsoft Learn
- Bypass custom Dataverse logic - Power Apps | Microsoft Learn
- SistemaHub public project information
Written for SistemaHub with AI assistance and source-based editorial checks.